PMS Country

Services

Strip-out and renovation prep

Mould-damaged buildings stripped out under containment, then left clean and ready for the builder or fit-out team.

Book an inspection

What's included

The scope.

  • Contamination mapping and risk assessment before works
  • Permit and logistics coordination
  • Controlled internal strip-out under containment
  • Wall cavities encapsulated in retained structures
  • Waste classified, bagged and disposed of
  • A clean substrate handed over for the next trade

How a job runs

Four steps. No surprises.

  1. 01

    Inspect

    We look at the site and scope the work. Photos of everything we find.

  2. 02

    Quote

    One fixed quote and one contract, with PMS Country.

  3. 03

    The work

    Done to the standard for the job, around your site's hours.

  4. 04

    Sign-off

    Before and after photos and a report. We walk the job with you.

Where we work

All of Western Australia.

Questions

Common questions.

+When is this needed?

When mould damage has gone far enough that linings, insulation or fit-out have to come out before the building can be repaired or refurbished.

+Who handles the permits?

Permit and logistics coordination is part of the scope, so the strip-out, waste and access are planned together.

+Is the building left ready for the next trade?

Yes. The area is left stripped, cleaned and encapsulated where needed, ready for the builder or fit-out team.