
Services
Air quality site audit
A documented indoor air quality check across your site: inspection, moisture mapping, sampling and a costed, prioritised plan.
Book an inspectionWhat's included
The scope.
- Full site walk-through and visual survey
- Moisture mapping and thermal imaging
- Air conditioning and ventilation inspection
- Air and surface sampling, tested by a lab
- Risk-rated findings in a written report
- Costed, prioritised plan for any remediation
How a job runs
Four steps. No surprises.
- 01
Inspect
We look at the site and scope the work. Photos of everything we find.
- 02
Quote
One fixed quote and one contract, with PMS Country.
- 03
The work
Done to the standard for the job, around your site's hours.
- 04
Sign-off
Before and after photos and a report. We walk the job with you.
Where we work
All of Western Australia.
Questions
Common questions.
+How is an audit different from mould testing?
Testing answers a question about one area. An audit looks at the whole site: the building, the moisture, the air conditioning and ventilation, with sampling where it adds something. It is the better choice when you're not sure where the problem starts or how far it goes.
+What do we get at the end?
A written report with risk-rated findings, photos, sampling results and a costed, prioritised plan, set out so a facilities manager can take it straight to budget or to a contract variation.
+Do we have to use PMS Country for the remediation?
No. The report is yours to act on however you choose. If you'd like PMS Country to quote the work, the scope is already written, which saves a second visit.
+When should we commission an audit?
Before a lease or handover, after water damage, when complaints about the air keep coming in, or as a baseline before a maintenance contract starts.